Recent Projects
ARDLETHAN TIN MINE OVERPASS PROJECT
RWI supplied and installed steelworks for an over pass at Ardlethan Tin Mine. This project had a very narrow time frame for the steelwork. RWI was able to fabricate and install over 65t of steel in a four week period.
(1) RWI fabricating one half of grate

(2) RWI transporting steel to site

(3) RWI erecting over pass

(4) RWI erecting over pass

39 Lewington Street WAGGA WAGGA NSW 2650
Phone: 02 6921 3062 Fax: 02 6921 4472 email: inquiries@ramblerwelding.com.au
